Description: Gas Natural Acu Terminal is an LNG terminal located in a power complex and gas hub near Rio de Janeiro in Brazil. The terminal makes use of the FSRU Bw Magna and has a receiving capacity of 5.6m t/y and supplies LNG to on-site, gas-fired power plants. The project began operating in 2021. Project_Id: PEIM0419 Comments: Project partners own and operate the project through their consortium, Gas Natural Acu. EIG and Mubadala holds their shares in the project through the EIG majority-owned Prumo Logistica Global. No further update from this project October 2023. Origin_Dest: On-site power plant Operator: EIG, Mubadala, bp, Siemens Consortium No_St_Tanks: 1 No_Trains: null End_date: null Status: Operating Location: Porto do Acu, Rio de Janerio Proc_meth: Floating Storage Regasification Unit [FSRU] Proj_cap: 5.6 Latitude: -21.84994203 Longtitude: -41.01010044 Con_email: null Region: Central & South America Engineering_Co: null Start_date: 2021 Sub_status: Operational Country: Brazil Type_: Import Shareholders: EIG, Mubadala, bp, Siemens Store_notes: 1 x 173,400cm FSRU Capex: null Constructor_Co: Daewoo Shipbuilding & Marine Engineering Project: Gas Natural Acu Terminal Store_cap: 173.4 Locality: Offshore Con_name: null Cont_job: null Con_number: null
Drawing Tool: esriFeatureEditToolPoint
ID: Under Construction
Name: Under Construction regasification terminal
Domains:
Templates:
Name: Under Construction, Export
Description:
Prototype:
Name: Under Construction, Import
Description:
Prototype:
Description: The Paldiski LNG terminal is an under construction Floating Storage Regasification Unit at Paldiski, 40km west of Tallinn. The capacity of the FSRU will be 1.8m t/y. Construction of the jetties and onshore infrastructure has been started Project_Id: PEIM0307 Comments: Estonia's liquified natural gas (LNG) terminal dock was completed in October 2022 ahead of schedule. The gas pipe that links it to the network will be finished by end November 2022. The LNG storage vessel that was assigned will not dock in Estonia after it was decided the vessel "Exemplar" will reside in Inkoo, Finland this winter. The Finnish government is trying to give Estonia priority access. A second phase of the project indicated the potential for a land-based LNG terminal Origin_Dest: Not specified Operator: Balti Gaas No_St_Tanks: 1 No_Trains: null End_date: null Status: Under Construction Location: Paldiski Proc_meth: Floating Storage Regasification Unit [FSRU] Proj_cap: 3.62 Latitude: 59.384797 Longtitude: 24.075693 Con_email: null Region: Europe Start_date: 2025 Sub_status: null Country: Estonia Type_: Import Shareholders: Balti Gaas (Alexela) Store_notes: 1 x 150,900cm FSRU Capex: 456 Constructor_Co: null Project: Paldiski FSRU Store_cap: 151 Engineering_Co: null Locality: Offshore Con_name: null Cont_job: null Con_number: null
Description: Penn America Energy is developing a natural gas liquefaction, storage and transshipment facility to export up to 7 million tons of liquefied natural gas (LNG) per year from supply sources from Appalachia Basin; it is expected to be in operation by 2028. Project_Id: PEEX9999 Comments: No further update to this project January 2023 Origin_Dest: Appalachia Basin Operator: Penn America Energy No_St_Tanks: null Locality: Onshore Con_number: null No_Trains: 2 End_date: null Status: Planned Location: Chester, PA Proc_meth: Not specified Proj_cap: 7 Con_name: null Latitude: 39.842148 Longtitude: -75.360809 Con_email: null Region: North America Engineering_Co: Bechtel Cont_job: null Start_date: 2028 Sub_status: Pre-FID Country: United States Type_: Export Shareholders: Penn America Energy Store_notes: null Capex: 8000 Constructor_Co: null Project: Penn LNG Liquefaction Store_cap: null
Drawing Tool: esriFeatureEditToolPoint
Name: Planned, Import
Description:
Prototype:
Description: Deutsche ReGas has proposed docking an additional FSRU in Lubmin, adding an additional 4.7m t/y of capacity to the Deutsche Ostsee Project. Deutsche ReGas also plans to move the first Desutche Ostsee FSRU further offshore, allowing an additional increase in capacity by of 1.5m t/y, for a total increase of 6.2m t/y. As of March 2023, the second FSRU was expected to be installed by December of 2023. The first FSRU was expected to move further offshore in summer of 2024. Project_Id: PEIM0311 Comments: No FSRU had been selected for the project as of March 2023. Location here is indicative and final location will be updated once the FSRU arrives. Origin_Dest: Not specified Operator: Deutsche ReGas No_St_Tanks: 0 Locality: Offshore Con_number: null No_Trains: null End_date: null Status: Planned Location: Lubmin Proc_meth: Floating Storage Regasification Unit [FSRU] Proj_cap: 6.2 Con_name: null Latitude: 53.549065 Longtitude: 8.164374 Con_email: null Region: Europe Engineering_Co: null Cont_job: null Start_date: 2023 Sub_status: Planned Country: Germany Type_: Import Shareholders: Deutsche Regas (100%) Store_notes: null Capex: null Constructor_Co: null Project: Deutsche Ostsee Phase II Store_cap: null
Longitude: 130.418026 Location: Tiwi Islands, Northern Territory Comments: Financial close for the initial phase of the Tiwi Hydrogen Project is targeted for 2023, ahead of first hydrogen export set for 2026 Process_Type: Photovoltaic (PV) Type: Solar Installed_cap_MW_num: 2800 Cost__MM: null Longitude1: 130.418026 Operator: Global Energy Ventures Project_Name: Tiwi Solar Farm Installed_capacity_MW: 2800 Financials: null Units: null Data_source: null Checked: y Technology: Bi-facial PV Date_amended: 11/2/2021 Start_date: 2023 Latitude1: -11.227121 Region: Asia Pacific Status: Planned Country: Australia Project_Scope: Global Energy Ventures is proposing a 2.8GW solar farm on Tiwi Island to supply power to the nearby proposed Tiwi Hydrogen Projetc Latitude: -11.227121 Further_reading: https://gev.com/ Shareholder: Global Energy Ventures Acreage__sq__km_: null